5-7 years...Hwy 6 expansion starting

4,780 Views | 39 Replies | Last: 1 mo ago by Hornbeck
Mister Shipwreck
How long do you want to ignore this user?
And it begins on Hwy 6...

TXDOT begins preparations for highway construction

Quote:

The widening project itself is expected to span five to seven years, and landscaping will follow that completion.

https://www.kbtx.com/2025/10/21/txdot-begins-preparations-highway-construction/


That is a Loooooooooonnnnnggggggg time....

I'll be retired before it is done...
CS78
How long do you want to ignore this user?
So best case scenario 7 years. Very likely 8+ years.
tu ag
How long do you want to ignore this user?
AG
Cars will all be flying by the time it is done.
Rapier108
How long do you want to ignore this user?
This is going to be a nightmare.
"If you will not fight for right when you can easily win without blood shed; if you will not fight when your victory is sure and not too costly; you may come to the moment when you will have to fight with all the odds against you and only a precarious chance of survival. There may even be a worse case. You may have to fight when there is no hope of victory, because it is better to perish than to live as slaves." - Sir Winston Churchill
MyNameIsJeff
How long do you want to ignore this user?
AG
They also started construction on Hwy 30 yesterday south of Hardy Weedon.

Pretty much every main road I travel in BCS is now under construction - Hwy 30, Hwy 6, 1179.
tu ag
How long do you want to ignore this user?
AG
Still haven't taken down construction zone stuff on 2818 either.
Bucketrunner
How long do you want to ignore this user?
Add Fitch between Tonkaway and rock Prairie. I am totally screwed.
TyHolden
How long do you want to ignore this user?
AG
I'm not driving again until 2032....
aggiesed8r
How long do you want to ignore this user?
AG
I just wish we could bypass Hearne via a loop.
doubledog
How long do you want to ignore this user?
aggiesed8r said:

I just wish we could bypass Hearne via a loop.

And Calvert, that is on TxDOTs 50-70 year plan.
halibut sinclair
How long do you want to ignore this user?
Started out as 5, now 5-7. My guess is 10.
Hornbeck
How long do you want to ignore this user?
AG
halibut sinclair said:

Started out as 5, now 5-7. My guess is 10.

Put me down for 15.
AggiePhil
How long do you want to ignore this user?
AG
However long it takes, it'll be worth it!
tu ag
How long do you want to ignore this user?
AG
For Gen Alpha.

Texas really needs to speed up infrastructure expansion. We are WAY behind and as we grow we are paying the price.
Roads. Power. Water. Etc.
Rapier108
How long do you want to ignore this user?
tu ag said:

For Gen Alpha.

Texas really needs to speed up infrastructure expansion. We are WAY behind and as we grow we are paying the price.
Roads. Power. Water. Etc.

Yep.

Need new highways, or expanding existing ones where possible.

Build new nuclear power plants, as well as SMRs, for sustained base load.

New reservoirs, construct desalination plants, and the pipeline infrastructure to move the water from the coast to where it is needed. Nuclear + desalination is a winning combination.
"If you will not fight for right when you can easily win without blood shed; if you will not fight when your victory is sure and not too costly; you may come to the moment when you will have to fight with all the odds against you and only a precarious chance of survival. There may even be a worse case. You may have to fight when there is no hope of victory, because it is better to perish than to live as slaves." - Sir Winston Churchill
Aggie_Fire
How long do you want to ignore this user?
AG
tu ag said:

Still haven't taken down construction zone stuff on 2818 either.

Where is there still construction zone stuff? I drive this all the time and everything has been picked up
Rexter
How long do you want to ignore this user?
As soon as they finish, the traffic load will be enough that it'll need to be 4 lanes in each direction.
[deleted]
How long do you want to ignore this user?
Unfortunately by the time they are done they will need 4 lanes on each side instead of 3.
Colonel Kurtz
How long do you want to ignore this user?
AG
Adding lanes doesn't even substantially help the flow of traffic
Buford T. Justice
How long do you want to ignore this user?
AG
We need 4 lanes now!
UmustBKidding
How long do you want to ignore this user?
Many years ago Paul Harvey opined about an article in the Brenham Banner-Press. It explained that in 3 Million years our sun would burn out. What was the point? That TxDOT would have to complete US 290 between Houston and Austin in the dark.
I expect the SH6 will be on the same schedule.
techno-ag
How long do you want to ignore this user?
AG
Prepare yourselves for years of slower speed limits on the bypass.
The left cannot kill the Spirit of Charlie Kirk.
CS78
How long do you want to ignore this user?
techno-ag said:

Prepare yourselves for years of slower speed limits on the bypass.


They're putting in a bypass?
AgProgrammer
How long do you want to ignore this user?
AG
MyNameIsJeff said:

They also started construction on Hwy 30 yesterday south of Hardy Weedon.

Pretty much every main road I travel in BCS is now under construction - Hwy 30, Hwy 6, 1179.

Just wait until the Highway 30 bridge over the Navasota goes under construction for the rebuild. That's the real nightmare coming.
Mister Shipwreck
How long do you want to ignore this user?
techno-ag said:

Prepare yourselves for years of slower speed limits on the bypass.

Oh yea. That sucks even more...
BCSWguru
How long do you want to ignore this user?
they needed three lanes each way in 2007
SCHTICK00
How long do you want to ignore this user?
AG
AgProgrammer said:

MyNameIsJeff said:

They also started construction on Hwy 30 yesterday south of Hardy Weedon.

Pretty much every main road I travel in BCS is now under construction - Hwy 30, Hwy 6, 1179.

Just wait until the Highway 30 bridge over the Navasota goes under construction for the rebuild. That's the real nightmare coming.


Half the new bridge will be built and traffic moved to it at the same configuration we have now.
NateDog
How long do you want to ignore this user?
AG
CS78 said:

techno-ag said:

Prepare yourselves for years of slower speed limits on the bypass.


They're putting in a bypass?

They were going to bypass The Bypass, but we No East Loopers shot that down!
Bucketrunner
How long do you want to ignore this user?
For a little while anyway
Boozer92
How long do you want to ignore this user?
AG
aggiesed8r said:

I just wish we could bypass Hearne via a loop.


That is a different project but bypassing Hearne is already planned https://www.gulfcoaststrategichighway.org
LOYAL AG
How long do you want to ignore this user?
AG
UmustBKidding said:

Many years ago Paul Harvey opined about an article in the Brenham Banner-Press. It explained that in 3 Million years our sun would burn out. What was the point? That TxDOT would have to complete US 290 between Houston and Austin in the dark.
I expect the SH6 will be on the same schedule.


reineraggie09
How long do you want to ignore this user?
AG
techno-ag said:

Prepare yourselves for years of slower speed limits on the bypass.


No one follows the speed limits on 6 anyways. Cops don't pull people over in Brazos and Grimes counties. Now hit the Waller county line and everyone knows to cut it down to 65
milner79
How long do you want to ignore this user?
tu ag said:

For Gen Alpha.

Texas really needs to speed up infrastructure expansion. We are WAY behind and as we grow we are paying the price.
Roads. Power. Water. Etc.

Yeah, or some folks just need to turn around and go home.
ukbb2003
How long do you want to ignore this user?
milner79 said:

tu ag said:

For Gen Alpha.

Texas really needs to speed up infrastructure expansion. We are WAY behind and as we grow we are paying the price.
Roads. Power. Water. Etc.

Yeah, or some folks just need to turn around and go home.


Go all-in on flying vehicles. Government could GIVE one to every person and still save money.
Its Not Rocket Surgery
How long do you want to ignore this user?
AG
Agree for the need for 4 lanes in each direction or we're going to be right back where we started a few years after they "finish." Unfortunately, strongly doubt anyone at TxDOT has that kind of foresight.
Page 1 of 2
 
×