Utility work at Fitch & 6

1,259 Views | 6 Replies | Last: 4 days ago by maroon barchetta
Tailgate88
How long do you want to ignore this user?
AG
Does anyone know what all they are doing on this utility work? I'm assuming adding a lot of capacity. I counted 22 bucket trucks between Towerpoint and Pebble Creek so I assume they are just bringing in more power for our expanding south College Station? Anyway, I'm glad I'm not up in the top of one of those buckets today those guys look cold.
maroon barchetta
How long do you want to ignore this user?
Secret data center inside the water tower?
kevmiller
How long do you want to ignore this user?
Big time disrupting traffic every morning and they are not even working in the mornings.
Buford T. Justice
How long do you want to ignore this user?
AG
Which will provide advanced statistical analysis of the travel ball teams that will play at the nearby ballpark.
jks08
How long do you want to ignore this user?
AG
Reconductor (upsizing the existing wire to one with higher capacity) of a portion of the transmission line from Greens Prairie Sub. See pg 41: https://blog.cstx.gov/wp-content/uploads/2025/10/10_09_2025-Regular-Agenda-Packet-City-Council.pdf
Tailgate88
How long do you want to ignore this user?
AG
Thank you.
maroon barchetta
How long do you want to ignore this user?
For reference:


Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.