We had a small leak from our fridge and water got onto and under our laminate flooring. I've since pulled up the flooring and dried out the area but I'll need to patch it for now. We don't have the funds to replace all of the flooring in our living/dining room, so this will have to do. Any ideas?
I'm thinking about fitting the patch as close as possible and use transition molding to "connect" it to the rest of the flooring. So the patch would be very obvious but I can't think of any better ideas. Has anyone else ever had to try this?
I'm thinking about fitting the patch as close as possible and use transition molding to "connect" it to the rest of the flooring. So the patch would be very obvious but I can't think of any better ideas. Has anyone else ever had to try this?