opie, tomorrow or Thurs I'll post what I have on the Y-sticks here. I have already ran it by all the old OCA YPs that I have contact with (8 including me) as well as some of the older Hogs that were around for a VEEERY long time. I want to post it here as well so that other old pots or anyone else (even if they aren't Hogs, I guess we won't hold that against them) can look it over and verify what I have.
So you old guys, dust off your memory and look over what I post so we can make sure it's as accurate as possible.
Just a brief note on what I am currently leaving out:
*The process WITHOUT sticks (the JGP overseeing the log should make the call on using sticks or not)
*Integration of the "new" helper rope with the sticks
*The new pipe dream anchorman.
*The IDEF process model

J/K, you can't tell I work for a process re-engineering company, can you?
Scott Coker '92/'95
[This message has been edited by COKEMAN (edited 3/29/2005 10:50p).]