Is it really still a work zone on Wellborn between Balcones and Rock Prairie? Or did the contractor just forget to remove the signs?
Cooter Davenport said:
Someone should go take them down.
The lanes between the work zone signs is rather rough. I bet they left them up and are going to resurface in the next few months. Besides, the signs slow some drivers down from 70 to 50 mph.oklaunion said:
I hope they will eventually re-surface much of that area.
Since it's a state highway, the city probably can't take the signs down. The can request TXDOT to do so.AgGunNut said:
https://www.cstx.gov/departments___city_hall/commserv/code/see_click_fix
I called COCS months ago after calling TxDOT because they informed me that this was a COCS run project. IMO COCS has their head in the sand. At that time they said signs stayed up because of RR Xing rework scheduling. That was done long ago.......woodiewood said:Since it's a state highway, the city probably can't take the signs down. The can request TXDOT to do so.AgGunNut said:
https://www.cstx.gov/departments___city_hall/commserv/code/see_click_fix
When they opened the crossing they took down all signs and it 2as back to 55 for a month or two.75AG said:
They'll start the resurfacing on Friday before a home football game.
Rexter said:
CSRD* needs something to do. Maybe if they write enough tickets, then the council can stop robbing CSU to add to the general fund.
* College Station Revenue Department, since they like to be so heavy-handed.