Houston
Sponsored by

Beltway 8 east of I-45...when are they going to finish the damn project?

1,153 Views | 9 Replies | Last: 17 days ago by redaszag99
MosesHallDeadPot94
How long do you want to ignore this user?
I feel like nothing has been done for many months since they tore down the main barricade. Has a contractor been awarded to finish the damn thing? What a re cluster f*** that has been.
TarponChaser
How long do you want to ignore this user?
MosesHallDeadPot94 said:

I feel like nothing has been done for many months since they tore down the main barricade. Has a contractor been awarded to finish the damn thing? What a re cluster f*** that has been.

You mean the same stretch that's been under construction since at least 2008?
Milwaukees Best Light
How long do you want to ignore this user?
AG
Email txdot and ask. They were responsive when I asked about 146.
Wearer of the Ring
How long do you want to ignore this user?
AG
Looks like its one pick up truck and two guys with a shovel.
Sea Speed
How long do you want to ignore this user?
AG
Milwaukees Best Light said:

Email txdot and ask. They were responsive when I asked about 146.


What did they say?
Milwaukees Best Light
How long do you want to ignore this user?
AG
I posted the email in my thread.
Sea Speed
How long do you want to ignore this user?
AG
I must have missed that or it fell off my watch list b
jamesf
How long do you want to ignore this user?
AG
If it is the Sam Houston Tollway construction, HCTRA would be in charge of the project, not TxDOT.
MosesHallDeadPot94
How long do you want to ignore this user?
Well, somebody told me at the start of this project that the concrete barrier was to be replaced because of its age and was deemed unsafe because of the damage from vehicular accidents. You would think they would start pouring concrete right away…maybe concrete for this type of project can only be poured under certain temperatures…
redaszag99
How long do you want to ignore this user?
jamesf said:

If it is the Sam Houston Tollway construction, HCTRA would be in charge of the project, not TxDOT.


No tolls between 45 and 59. TxDOT owns it so people can get to IAH
Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.