Toll Road 550 to SPI is open for bizness

2,458 Views | 4 Replies | Last: 12 yr ago by oldvalleyrat
SPI-FlatsCatter 84
How long do you want to ignore this user?
AG
Still have some work to do connecting it to 77 but after you clear that its basically non-stop from 77 to HEB in Port Isabel.

Easily 15 minutes faster than going thru Los Fresnos and 2 tons less aggravation
dirtyred
How long do you want to ignore this user?
oldvalleyrat
How long do you want to ignore this user?
AG
Wow! I was not even aware that that was in the works. Anything that keeps Los Fresnos off my radar screen is a good thing. Where does it start?
OXDL45
How long do you want to ignore this user?
SPI-FlatsCatter 84
How long do you want to ignore this user?
AG
OVR

We've been using it in its unfinished stages for 18 months but now it's finished other than the piece that connects to 77

Exit the Port of Brownsville which is Hwy 511, just before you get to Brownsville. Follow it all the way to Port Isabel.

Save 15 mins and flip the double bird to Los Fresnos PD
oldvalleyrat
How long do you want to ignore this user?
AG
I go to SPI from Edinburg and cut off for SPI at 100. I guess that this road cut off past that and closer to Brownsville. Interesting. I really hate driving though Los Fresnos!

[This message has been edited by oldvalleyrat (edited 6/10/2013 10:50p).]
Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.