Hwy 87 & Bolivar Peninsula

2,407 Views | 2 Replies | Last: 8 yr ago by Kenneth_2003
woodyhayes
How long do you want to ignore this user?
Finally. 87 is going to be raised from the curve off 124 at High Island all the way to Rollover. Txdot spending 14 million on something that should have been done yrs ago. Fill in rollover and crystal beach might actually have a beach.
OXDL45
How long do you want to ignore this user?
AG
What is the timeline for the project?
woodyhayes
How long do you want to ignore this user?
Supposed to start sometime next year. Didnt have a timeline stated. LJA Engineering out of Houston did the study. Dont know if they're doing the work.
Kenneth_2003
How long do you want to ignore this user?
AG
That's good to hear!

Now if Texas really want's beaches we've got to get the Mississippi River flowing where it want's to. That aint gonna happen anytime soon
Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.